Wednesday, April 3, 2013

List Update - There was so much more to this than we thought

So this list I made when we started was just a scratch on the surface of all the word we were going to have to do. But we are moving forward. Check it out:

      Move Parker’s closet to guest bathroom

·         Move bathroom to guest bathroom
·         Hang tarps and lay carpet protector down for demo
·         Buy bagster and other demo products
·         Cover vents to dust does not get everywhere
·         Remove medicine cabinet and other electrical fixtures
·         Remove light from wall
·         Remove mirror
·         Take out toilet
·         Take out bathroom vanity and sink
·         Rip up flooring
·         Remove door and frame
·         Remove fiberglass shower
·         Remove crown bolding (save for later)
·         Take out wall, cut half wall next to toilet
·         Call plumber to move plumbing for new shower and sink
·         Build new wall in bedroom (contractor)
·         Level flooring
·         Buy tile for floor and shower
·         Hang sheetrock
·         Hang hardy backer board for tile
·         Build shower pan (Contractor)
·         Move electrical outlets and lights
·         Lay floor tile
·         Lay shower tile
·         Grout and finish all tile
·         Paint walls (do a beadboard?)
·         Bagster pickup
·         Install new toilet
·         Install new lighting and fan
·         Install new vanity
·         Install new mirror
·         Rehang crown molding in bedroom
·         Install all new shower fixtures and faucet in sink
·         Finishing touches
·         Drink a beer (or bottle of wine depending on our mood)

No comments:

Post a Comment