·
Move Parker’s closet to guest bathroom
·
Rip up flooring
·
Remove door and frame
·
Build new wall in bedroom (contractor)
·
Level flooring
·
Buy tile for floor and shower
·
Hang sheetrock
·
Hang hardy backer board for tile
·
Build shower pan (Contractor)
·
Move electrical outlets and lights
·
Lay floor tile
·
Lay shower tile
·
Grout and finish all tile
·
Paint walls (do a beadboard?)
·
Bagster pickup
·
Install new toilet
·
Install new lighting and fan
·
Install new vanity
·
Install new mirror
·
Rehang crown molding in bedroom
·
Install all new shower fixtures and faucet in
sink
·
Finishing touches
·
Drink a beer (or bottle of wine depending on our
mood)
So we have a lot left to do. But we have gotten a lot done as well. We are cleaning up from Demo tonight and posting some more pictures of that process tomorrow. Then we are off to work on the floor and start building everything back up!
No comments:
Post a Comment